Just reporting that construction is well under way on the new boat. After reading
The design is based on the shapes I was playing with in the last post and prior. The design development/evaluation did progress to a better CFD package (thankfully), and the results looked promising enough to invest some time in building. You have to draw the line somewhere right? There was certainly still room for improvement but CFD runs take so much time that I got sick of trying new things and decided to aim for some real world testing. More fun. Notable features: wing shaped tramps blended into the hull for super sweet aero, forward mast and foil position, centre 'console' to consolidate all the messy lines and reduce drag, aero gantry and probably some other things that I'm not talking about just yet. The rig, mainfoil horizontal, complete rudder and adjustable wand are all spares that didn't go with 'Half Meanie'.
As usual my composite products and consumables have come from
0 komentar:
Posting Komentar
Catatan: Hanya anggota dari blog ini yang dapat mengirim komentar.